Send us the job.
We'll quote it
in 48 hours.
Free on-site visit. Written quote with mix specs, reinforcement, joint plan, and schedule. Most estimates return within two business days across Dubuque and the Tri-State Area.
Every quote is a spec sheet.
- Site visit + measurementsWe walk the project, take grade + access notes.
- Mix designPSI, air entrainment %, aggregate, admixtures.
- ReinforcementWire mesh, fiber, or rebar grid spec.
- Joint planSaw-cut spacing for crack control.
- PermitsCoordinated with city inspections.
- Warranty1–10 year workmanship terms.
- SchedulePour window + cure plan.
From submit to pour.
Every bid request goes through the same five-step process. No mystery, no chasing.
- 01Form lands in our inbox
Auto-confirmation goes back to you immediately. We acknowledge personally within one business day.
- 02Brief phone call
We confirm scope, location, and access. Schedule the site visit.
- 03On-site walk
Dimensions, subgrade check, access notes, finish discussion. 20 minutes for most residential, longer for commercial.
- 04Written quote
Spec-sheet quote within 48 hours of the walk. Mix design, joint plan, schedule, warranty.
- 05Sign + schedule
Approve the scope, place 10–30% deposit. We pull permits and lock ready-mix delivery for your pour window.
Quick answers.
How long does a free estimate take? +
The on-site walk takes 15–45 minutes depending on scope. Most residential projects are wrapped in 20 minutes. The written quote turns around within 48 hours of the site visit.
Is the estimate truly free or is there a callback fee? +
Truly free. No site-visit fee, no callback fee, no obligation. We only charge for the work in a signed scope agreement.
What is in a Dubuque Concrete Pros written quote? +
Dimensions, mix design (PSI, air entrainment %, aggregate), reinforcement type and spec, joint plan, subgrade prep, finish, permit handling, cure protection, sealer notes, schedule window, and warranty terms. Everything you need to compare bids fairly.
How long is a written quote valid? +
Standard quotes are valid for 30 days. After that we may need to re-price for material or fuel changes — but most clients schedule within the window.